1. Petey’s Pretzels bakes soft pretzels on an assembly line. It currently bakes 800 pretzels each 8-hour shift. If the production is increased to 1,200 pretzels each shift, then productivity will have increased by: so the answer is 50% increase i would like an explenation on how we got 50% ?

In 8 hours, number of pretzels baked = 800

SO hourly production = 100

If production is increased to 1200,

hourly production = 1200/8 = 150

So, change in productivity = (150-100) /100 * 100%

= 50%

Thanks for installing the Bottom of every post plugin by Corey Salzano. Contact me if you need custom WordPress plugins or website design.

CategoriesUncategorized