1.The method used to collect information to use through all phases of the project life cycle is called
A) Responsibility matrix
B) Organization breakdown structure
C) Work breakdown structure
D) Priority matrix
E) Work package

2
The first step in creating the necessary information to manage a project is to
A) Establish project priorities
B) Define the project scope
C) Verify the budget available
D) Assign team members to work on the project
E) Determine the required completion date

3
Research shows the most frequently mentioned barrier to project success is
A) Not enough budget resources
B) Poor performance by team members
C) Weak project leadership
D) Poorly defined scope or mission
E) Political in-fighting

4
An expected output over the life of a project would be classified as
A) A deliverable
B) A product
C) An end object
D) An objective
E) A target

5
The ability of 911 emergency systems to identify the caller’s phone number and location are considered to be a
A) Technical requirement
B) Milestone
C) Project limit
D) Project exclusion
E) Project deliverable

6
“To construct a high-quality, custom home within five months at costs not to exceed $150,000” is best classified as
A) A deliverable
B) A milestone
C) An objective
D) A limit
E) An exclusion

7
Which of the following is not one of the basic classifications of project priorities?
A) Profit
B) Cost
C) Time
D) Performance
E) All of these are basic classifications

8
If a project criterion indicates that the project must meet a specific date, that criterion is classified as
A) Constrained
B) Enhanced
C) Accepted
D) Limited
E) Fixed

9
The tool used to assist in making project trade-offs between schedule, budget, and performance objectives is called a
A) Responsibility matrix
B) Work breakdown structure
C) Project priority matrix
D) Work package
E) Criterion matrix

10
The highest element in the hierarchical breakdown of the WBS is
A) A work package
B) Sub deliverables
C) A cost account
D) Major deliverables
E) The project

11
All of the following are usually included in a work package except
A) What will be done?
B) The time needed to complete the work
C) A single person who is responsible for its completion
D) All the costs for the work package
E) All of these are included in a work package

12
The final step in the creation of a Work Breakdown Structure is to
A) Code the WBS for tracking
B) Assign the cost account to a manager
C) Assign the work package to a manager
D) Develop the responsibility matrix
E) All of these are included in the final step

13
The intersection of the WBS and the OBS is called the
A) Responsibility matrix
B) Priority matrix
C) Work package
D) Cost account
E) Project overlap

14
If a project is small or of narrow scope and does not require an elaborate system, which of the following is a good choice?
A) Responsibility matrix
B) Organization breakdown structure
C) Work breakdown structure
D) Priority matrix
E) Process breakdown structure

15
The tendency for the project deliverables to expand over time-usually by changing requirements, specifications, and priorities-is called:
A) Scope erosion
B) Scope creep
C) Project bloat
D) Scope enhancement
E) Project add-ons

 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"
Looking for a Similar Assignment? Our Experts can help. Use the coupon code SAVE30 to get your first order at 30% off!

Hi there! Click one of our representatives below and we will get back to you as soon as possible.

Chat with us on WhatsApp